top of page
Process Improvement
CUT-OFF SAW TABLE
To reduce material costs and improve production efficiency, a retrofit kit was developed to utilize an industry standard spool of material instead of the more expensive, proprietary spool. This allowed the company to save thousands of dollars and reduce machine downtime during spool change-out. The retrofit kit also improved machine performance beyond OEM performance.
The Value of Steinbrink Engineering
-
Problem Identification
-
Ideation
-
Design & Engineering
-
3D CAD modeling
-
Dynamics and Kinematics Analysis
-
FEA Simulation
-
Manufacturing Process Optimization
-
3D Printing
bottom of page